To give you an idea of our capabilities we have included some of the projects we have been involved in. Click on the tabs below to view some of our more notable designs or download a PDF file that lists and describes the work we have been involved in:
KEPPEL BAY MARINA
Location: Singapore
Period of Involvement: 2006-2010
Number of Berths: 127 Berths
Involvement: Design of floating marina structures, Gangways and Piling.
DUBAI MARINA
Location: Dubai, United Arab Emirates
Period of Involvement: 2003 – 2010
Project Description:
A waterway over 3kms long with up to 4 separate marinas, a boat servicing facility and water taxi terminals servicing the residential development around the waterway. Up to 800 berths constructed.
Involvement:
- Market Demand for marina berths and vessel servicing facility
- Locate marinas and prepare concept layouts including water taxi terminals and vessel servicing facility
- Feasibility study for the first marina and vessel servicing facility
- Design of floating marina structures, gangways and piling
YAS MARINA
Location: Yas Island, Abu Dhabi, United Arab Emirates
Period of Involvement: 2008 – 2009
Project Description:
Yas Marina is positioned alongside the Formula One race track development in Abu Dhabi. The marina has 142 berths to accommodate vessels from 15 metres to 66 metres with guest berthing available for super yachts up to 150 metres.
Involvement: Design of floating marina and super yacht berth structures, gangways and piling.
ST GEORGE MOTOR BOAT CLUB
Location: Sydney, Australia
Period of Involvement: 2001-2003
Project Description: An existing fixed jetty marina to be replaced by a floating marina. The site is exposed to waves from the south to the west and the existing marina was rapidly deteriorating under the conditions at the site. The seabed material is very soft marina sediments overlying rock. The project involved dredging and the removal and replanting of seagrass.
Involvement: Marina layout drawings, cost estimates and tender documents for the new marina. This was followed by the management and technical input to an Environmental Impact Statement. Following the construction approval being granted and a tender being awarded, quality audits and construction supervision were undertaken.
Of Special Note: The site is exposed to quite large waves from the south. It was decided that a floating attenuator would be able to withstand the wave climate and to provide adequate attenuation. The existing timber fixed structure was unable to provide adequate attenuation. The new attenuator is one of the heaviest ever used in Australia and is curved in plan. Its performance has surpassed the predicted behaviour.
YARRA’S EDGE MARINA
Location: Melbourne, Australia
Period of Involvement: 2001 – 2005
Number of Berths: 149
Involvement: Design of floating marina structures.
Tender Documentation.
CRUISING YACHT CLUB OF AUSTRALIA MARINA
RUSHCUTTERS BAY MARINA
SYDNEY 2000 OLYMPICS MARINA
[su_spacer]
Project Description:
- 175 berth Club Marina
- 100 berth Commercial Marina
- 141 berth Marina for 2000 Olympic Games
Involvement: Layout detail to convert the original fixed marina to a modern international standard floating marina facility. Detailed design of floating structures and piling.
Layout design to suit Client requirements and detailed design of floating structures, access gangways and piling. Detailed design of a floating marinas.
ROYAL MOTOR YACHT CLUB BROKEN BAY
Location: Sydney, Australia
Period of Involvement: 2002-2004
Project status: Completed
Project Description: Replacement of old fixed marina structures with modern floating marina including floating wave attenuator to replace ineffective existing fixed panel breakwater in water depths up to 12 metres and soft sea bed soils conditions.
Involvement: Design of new floating marina structures, review of wave climate studies and determination of suitable wave attenuation structures to provide satisfactory all weather wave climate..
Of Special Note: The determination of a suitable wave attenuator included wave flume modelling and the design of a curved attenuator structure to achieve maximisation of berths and attenuator performance objectives.
ROYAL PRINCE ALFRED YACHT CLUB MARINA
Location: Sydney, Australia
Period of Involvement: 1999
Project status: Completed
Project Description: 237 Berth yacht club marina, redevelopment to convert the fixed marina to a modern floating marina facility.
Involvement: Adjust layout to maximise numbers of berths and minimise loss of berths during the demolition of the fixed structure and construction of the floating marina. Detailed Design of floating structures, gangways and piling.
Of Special Note: Marina designed to withstand waves approaching the marina from the West and impacting on T-heads and also entering fairways.
SEE MORE OF OUR PAST PROJECTS
These PDF downloads list all the projects we have proudly been involved in. Depending on the level of detail you want to investigate we have provided three options. These options have been ranked in detail, with the level of detail increasing as you move down the list.
∇ Marina Planning and Design – This document tabulates plans and designs that IMC has been associated with in Australia and overseas. It also includes the scope of the project and berths.
∇ Marina Detailed Design – This document tabulates in detail projects IMC has been associated with including marina systems, layout, design, other facilities provided, construction and specifications
∇ Detailed Project Descriptions of Planning and Design – This document provides a written synopsis of each project that we have been associated with.